Commissioning/Field settings record sheet (continued from the previous page)
Main remote controller screen Parameters
Default
setting
Field
setting
Notes
Menu
Service Operation
settings
Smart grid ready DHW On/O O
Target temp. (+1 to +30°C) / -- (Non active) --
Heating On/O O
Target temp. Switch-on recommendation (20 to
60/70/75°C)
50°C
Switch-on command (20 to
60/70/75°C)
55°C
Cooling On/O O
Target temp. Switch-on recommendation (5 to
25°C)
15°C
Switch-on command (5 to 25°C) 10°C
Pump cycles Heating (On/O) On
Cooling (On/O) On
Interval (10 to 120 min.) 10 min.
Floor dry up On/O *11 O
Target tempera-
ture
Start & End (20 to 60/70/75°C) 30°C
Max temperature (20 to
60/70/75°C)
45°C
Max temperature period (1 to 20
days)
5 days
Flow temperature
increase
Temperature increase step (+1 to
+30°C)
+5°C
Increase interval (1 to 7 days) 2 days
Flow temperature
decrease
Temperature decrease step (-1 to
-30°C)
−5°C
Decrease interval (1 to 7 days) 2 days
Summer mode On/O O
Ambient tem-
perature
Heating on (4 to 19°C) 10°C
Heating o (5 to 20°C) 15°C
Judgement time Heating on (1 to 48 h) 6 h
Heating o (1 to 48 h) 6 h
Forced heating On (-30 to 10°C) 5°C
Auto change over On/O O
Ambient tem-
perature
Heat→Cool (10 to 40°C) 28°C
Cool→Heat (5 to 20°C) 15°C
Judgement time Heat→Cool (1 to 48 h) 6 h
Cool→Heat (1 to 48 h) 6 h
Water ow control On/O O
Water tempera-
ture dierence
*20
Heating (+3 to +20°C) +5°C
Cooling (+3 to +10°C) +5°C
Holiday mode Zone 1 heating
room temp.
10°C to 30°C 15°C
Zone 2 heating
room temp. *1
10°C to 30°C 15°C
Zone 1 heating
ow temp.
20°C to 60/70/75°C 35°C
Zone 2 heating
ow temp. *2
20°C to 60/70/75°C 25°C
Zone 1 cooling
ow temp. *3
5°C to 25°C 25°C
Zone 2 cooling
ow temp. *3
5°C to 25°C 25°C
Zone prohibited Heating (Zone 1) Permitted/Prohibited Permitted
Heating (Zone 2) Permitted/Prohibited Permitted
Cooling (Zone 1) Permitted/Prohibited Permitted
Cooling (Zone 2) Permitted/Prohibited Permitted