c:
6-1
FZ-4OAW
(WIRE
LINK) INSTALLATION
Fz-40 A
W
F2-40A
W
Attach the
unit
to
the
PC
in
the same manner
as
the F2-40AC (Section5-1).
Connect two
units
with
a twist-pair cable as illustrated (SA
to
SA,
SB
to
SB),
and
both
ends
of
sealing twist are connected
to
the earth terminals
of
the
PCs.
The cable length shall be less than
10
meters (approx.
35
feet) and keep away
from
high voltage
suppty cables
or
other such electrical apparatus
to
avoid electrical noise interference.
6-2
FZQOAP (OPTICAL
FIBER
LINK) INSTALLATION
Optical
/
Optical
connectors
Attach the
unit
to
the PC
in
the same manner as the F2-40AC (Section
5-1
).
Connect
two
units
with
optical plastic fiber cables as illustrated
(R
to
T,
T
to
R).
The cable length shall be less than
50
meters (approx.
160
feet).
The optical fiber cables and opticaf connectors are
not
included
in
the attachment. The material
specifications and
supply
shall be inquired
to
Mitsubishi agent.
-17-