EasyManua.ls Logo

Mitsubishi Q12PRHCPU - Page 392

Mitsubishi Q12PRHCPU
424 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
App - 31
Appendix 5 Method for Starting up the Previous Control System
APPENDICES
POINT
1. If CC-Link system master/local modules are mounted on the main base unit,
system B cannot be started up as the control system.
Start up system A as the control system.
2. If CC-Link system master module is mounted on the main base unit, system B
cannot start as the control system.
3. If all stations are faulty in CC-Link network system, A system will be control
system since Xn1 does not turn ON. To start with the previous control system,
power ON the programmable controller CPU after powering ON the CC-Link
remote I/O stations.
4. To use the Rise/Fall execution instruction in a program of B system after
system switching, set [Do tracking] at [Signal flow memory tracking setting] on
[Tracking settings] in redundant parameter.

Table of Contents

Related product manuals