EasyManua.ls Logo

Mitsubishi QD75P1N - Page 406

Mitsubishi QD75P1N
858 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 - 90
MELSEC-Q
9 MAJOR POSITIONING CONTROL
Operation timing and processing time during speed-position switching
control (INC mode)
Standby
Speed control
Standby
Axis operation status
M code OFF request
Positioning operation
t1
t2
t3
t4
t5
t2
t7
Position control
t6
Cd.7
Positioning start signal
[Y10,Y11,Y12,Y13]
BUSY signal [XC,XD,XE,XF]
M code ON signal [X4,X5,X6,X7]
(WITH mode)
Cd.7
Start complete signal [X10,X11,X12,X13]
Md.26
Output pulse to external source
(PULSE)
External speed-position
switching command
Positioning complete signal
[X14,X15,X16,X17]
M code ON signal [X4,X5,X6,X7]
(AFTER mode)
M code OFF request
Md.31
Status: b4
OPR complete flag
Md.31
Status: b1
Speed-position switching latch flag
Speed control carried out until speed-position switching
signal turns ON
Position control movement amount is from the input position of
the external speed-position switching signal
Speed
control
Position
control
Fig. 9.14 Operation timing and processing time during speed-position switching control (INC mode)
Normal timing time
Model t1 t2 t3 t4 t5 t6 t7
QD75P N/QD75D N 0.2 to 1.1ms 0 to 0.9ms 0 to 0.9ms 0.4 to 1.3ms 0 to 0.9ms 1.0ms
QD75P /QD75D 1.1ms 0 to 1.8ms 0 to 1.8ms 2.7 to 4.4ms 0 to 1.8ms 1.0ms
Follows
parameters
The t1 timing time could be delayed by the operation state of other axes.

Table of Contents

Related product manuals