EasyManua.ls Logo

Movincool CLIMATE PRO 18 - Page 92

Movincool CLIMATE PRO 18
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Repair Section
92
(3) Checking vacuum
1) Leave the high pressure valve and the low
pressure valve of the gauge manifold closed for 5
minutes or more, and confirm that the gauge
pointer does not return to zero.
2) If the gauge pointer returns gradually to zero
there is a leak somewhere in the system (this
could also include gauge manifold). Perform leak
check according to procedure indicated in the
next step. Once leak has been found and
repaired, evacuate the system once more and
confirm the system holds vacuum.
ILL00085-00
Return
Pipe Brazing
LO
Closed
HI
Closed
Valve Setting
Pressure Gauge

Table of Contents

Related product manuals