EasyManua.ls Logo

mr. steam MS-SUPER 2E User Manual

Default Icon
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
mr
.
steam
®
steamtherapy
®
Residential Steambath Generator Systems
Installation, Operation & Maintenance Manual
Models 90E-400E
Models Super 1E-6E

Other manuals for mr. steam MS-SUPER 2E

Question and Answer IconNeed help?

Do you have a question about the mr. steam MS-SUPER 2E and is the answer not in the manual?

mr. steam MS-SUPER 2E Specifications

General IconGeneral
Brandmr. steam
ModelMS-SUPER 2E
CategoryIron
LanguageEnglish

Summary

Safety and Operation Guidelines

General Safety Precautions

General safety guidelines, including warnings about children and steam exposure.

Health Considerations

Risks associated with steam temperature, humidity, and impact on pregnant women or those with health conditions.

Overheating and Scalding Risks

Warnings about exiting immediately if uncomfortable, avoiding prolonged heat exposure, and medical conditions.

Slipping and Fall Injury Risks

Advisories to use care when entering/exiting the steam room due to slippery floors.

Model Selection and Sizing

Room Volume Calculation

Process to calculate steam room volume, including adjustments for materials and height.

Generator Specification Chart

Chart detailing specifications for different Mr.Steam generator models, including room volume capacity.

Pre-Installation and Steam Room Guidelines

General Installation Notes

Crucial information for safe and proper installation and operation of the steambath generator.

Steam Room Construction Requirements

Guidelines for steam room enclosure, materials, doors, flooring, and ceiling height.

Steam Generator Location and Installation

Location Selection Criteria

Guidance on where to install the steam generator, avoiding freezing, moisture, and flammable materials.

Installation Best Practices

Recommendations for clearances, unions, and control placement for optimal installation.

Multi-Generator Configuration (MS SUPER 4E, 5E, 6E)

Generator Interconnection

Instructions for installing and connecting multiple MS Super series steam generators using an interconnecting cable.

Plumbing Installation

Water Supply Connection

Instructions for connecting the water supply line, including pressure and valve requirements.

Drain and Steam Outlet Connections

Guidelines for drain valve, steam outlet piping, and steam line insulation.

Safety Valve and Drain Pan

Requirements for safety valve installation and recommendations for using a drain pan.

Steam Head Installation

Steam Head Placement and Initial Install

Guidance on locating the steam head and initial installation steps, including avoiding hot surfaces.

Steam Head Final Assembly

Instructions for connecting the steam line and securing the steam head assembly to the wall.

Generator Dimensions and Connections

Generator Diagram and Dimensions

Visual representation of the generator with key dimensions and connection ports clearly labeled.

Connection Port Sizes

Specification of NPT sizes for water inlet, steam outlet, safety valve, and drain valves.

Electrical Wiring and Connections

Electrical Installation Guidelines

Instructions for qualified electricians regarding power voltage, wiring, grounding, and circuit breakers.

Field Power Wiring Diagrams

Illustrative diagrams for connecting power supply to the steam generator models.

Single Phase Wiring Diagrams

MS 90E-400E Wiring

Wiring schematic for single phase MS 90E through MS 400E models with eTempo controls.

MS SUPER 1E-3E Wiring

Wiring schematic for single phase MS Super 1E through 3E models with eTempo controls.

MS Super 4E-6E Wiring and Installation

Multi-Generator Installation Steps

Installation steps for connecting multiple MS Super 4E, 5E, and 6E generators, including their interconnecting cable.

MS Super 4E-6E Wiring Diagram

Wiring schematic for single phase MS Super 4E, 5E, and 6E models.

Tandem Operation and Troubleshooting

Optional Tandem Cable Installation

Diagram and instructions for connecting more than two steam generators in tandem using an optional cable.

Initial Start-Up and Checkout

Procedures for initial startup, testing, and checking the generator's operation after installation.

System Status Codes

Explanation of system status codes displayed by the control, their probable causes, and suggested remedies.

Optional AutoFlush System

AutoFlush Operation and Installation

Information on the AutoFlush system's function, contents, and detailed installation instructions.

AutoFlush System Checks

Guidance on using sweat fittings and procedures to check the AutoFlush system's operation.

Optional Features and Control Board

Optional Drain Pan and Express Steam

Details on the optional drain pan for leak protection and the Express Steam feature for faster steam.

Liquid Level Control Board Indicators

Explanation of the LED indicators on the Liquid Level Control Board and the function of the test button.

Internal Component Views

MS Regular Models Components

Illustration of internal components for MS Regular Models, including access and connection points.

MS Super Models Components

Illustration of internal components for MS Super Models, showing key parts and connections.

Replacement Parts List

Component Part Numbers

Comprehensive list of replacement parts with part numbers and applicable models.

eTEMPO Controls Installation

eTEMPO Control Box Contents and Overview

Details on what is included in the eTEMPO control package and dimensional information.

Before Installing eTEMPO Control

Important notes and cautions regarding the installation of the eTEMPO control unit.

eTEMPO Control Installation Steps

Control Location and Generator Compatibility

Guidance on selecting the control location and ensuring steam generator compatibility and serial number.

Control Cable Routing

Instructions for drilling holes and routing the control cable from the cutout to the steam generator.

eTEMPO Control Mounting and Testing

Connecting and Testing the Control

Procedures for connecting the control, powering up, and testing its functionality.

Mounting the Control Unit

Instructions for preparing the surface, applying silicone, and mounting the eTEMPO control unit to the wall.

Remote Temperature Probe Installation

Probe Location and Requirements

Guidelines for positioning the remote temperature probe within the steam room for accurate readings.

Connecting the Probe to Generator

Instructions for drilling a hole, removing a knock-out, and connecting the probe cable to the generator's circuit board.

Securing and Finalizing Probe Installation

Routing and Sealing the Probe Cable

Instructions for routing the probe cable through the wall and applying silicone for a moisture seal.

Exposing the Temperature Bulb

Guidance on correctly exposing the temperature bulb for accurate sensing and avoiding obstructions.

Steam Genie Interface Module Installation

Connecting and Mounting the Module

Instructions for connecting the Genie Interface Module and mounting it in a suitable location.

Verifying Module Operation

Steps to verify the correct connection and operation of the Steam Genie Interface Module and its lights.

Steam Genie Pairing and Troubleshooting

Steam Genie Pairing Procedure

Procedures for pairing the Steam Genie remote with the interface module and changing addresses.

Steam Genie Troubleshooting

Troubleshooting guide for common issues, including remote control problems and error conditions.

eTEMPO Control Care and Safety

Control and Steamhead Care

Tips for cleaning and maintaining the eTEMPO controls and steamheads using mild soap and water.

Homeowner Safety and Maintenance

Safety guidelines for using eTEMPO controls and basic maintenance procedures for the steam generator.

eTEMPO Control Operation

Basic eTEMPO Functions

Instructions for operating the eTEMPO control, including turning steam on/off, pausing, and timer features.

Temperature and Unit Settings

Guidance on setting the desired temperature and switching between Fahrenheit and Celsius units.

eTEMPO/PLUS Control Operation

Powering Up and Basic Functions

Instructions for powering up the unit, basic ON/OFF operation, and setting the clock time.

Setting Time Duration and Viewing Clock

How to set the steam duration and view the current clock time on the eTEMPO/PLUS control.

eTEMPO/PLUS Advanced Features

Temperature and Memory Settings

How to adjust temperature, change units, and utilize memory features for preferred settings.

Programmable Settings and Aromas

Instructions for programming preferred settings (PROG I/PROG 2) and operating the AromaSteam feature.

Essential Oils and Steam Genie Battery

Using Mr.Steam Essential Oils

Guidelines and cautions for using essential oils with the AromaSteam steamhead for aromatherapy.

Steam Genie Battery Replacement

Step-by-step instructions for replacing the battery in the Steam Genie remote control.

Steam Genie Operation and Interface Module

Steam Genie Remote Operation

Instructions on how to use the Steam Genie remote to control the steam generator and interpret indicator lights.

Genie Interface Module Status

Explanation of the status LEDs on the Genie Interface Module and their meaning for generator operation.

Related product manuals