EasyManua.ls Logo

MR CEDASPE DAROC EDS-R Series - Page 4

MR CEDASPE DAROC EDS-R Series
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table of contents
4 10014218/00 EN
5.2 Gasket requirements ..................................................................... 23
5.3 Preparation for mounting ............................................................... 24
5.4 Fastening the shutter valve to the pipe.......................................... 26
5.5 Installing the bypass (optional) ...................................................... 28
5.5.1 Installing the BPR (ball valve) bypass (optional)........................................ 29
5.5.2 Installing the BPC (drive shaft) bypass (optional) ...................................... 30
5.6 Electrical connection...................................................................... 31
5.6.1 Cable recommendation .............................................................................. 31
5.6.2 Electrically connecting the reed switches................................................... 31
6 Commissioning...................................................................34
6.1 Filling with oil and performing the venting test............................... 35
6.1.1 Filling with oil via transformer tank ............................................................. 35
6.1.2 Filling with oil via conservator .................................................................... 36
6.2 Leak test ........................................................................................ 36
6.3 Testing the reed type switches ...................................................... 37
7 Operation.............................................................................38
7.1 Alarm state..................................................................................... 38
7.2 Resetting the shutter valve ............................................................ 38
7.2.1 Resetting manually..................................................................................... 39
7.2.2 Resetting via the BPR (ball valve) bypass (optional) ................................. 40
7.2.3 Resetting via the BPC (drive shaft) bypass (optional)................................ 41
7.2.4 Resetting via the BPM (rotary knob) bypass (optional).............................. 43
8 Maintenance and inspection .............................................44
8.1 Draining the insulation fluid – device version without bypass........ 44
8.2 Draining the insulation fluid – device version with bypass............. 44
9 Disposal...............................................................................48
10 Technical data.....................................................................49

Related product manuals