
Do you have a question about the MTA NGSi 07 and is the answer not in the manual?
Key safety regulations and employer obligations to ensure worker safety during equipment operation.
Mandatory personal protective equipment (PPE) requirements for safe operation and maintenance.
Description of unit safety signs and their meanings for personnel compliance.
Safety information, first aid, and handling procedures for refrigerants used in the unit.
Explanation of the microprocessor-based control system, its functions, and integration capabilities.
List of standard monitoring and protection devices included in the unit.
General installation guidelines, emphasizing compliance with instructions and safety precautions.
Instructions for safe lifting and handling of the unit to protect internal components.
Guidelines for unit placement, required clearances, and vibration damping.
Requirements for water connections, pipeline materials, insulation, and component installation.
Schematic diagram illustrating the water system components and connections.
Refrigerant circuit diagram for 5-9 kW chiller models.
Guidelines for electrical connections, voltage checks, and compliance with regulations.
Detailed explanation of terminal board connections for power supply and control signals.
Electrical wiring diagram for NGSI 05 and 07 models.
Electrical wiring diagram for the NGSI 10 model.
Electrical wiring diagram for the NGSI 15 model.
Diagrams showing electrical connections for the double setpoint kit.