6� Connect steel cables (g. 7).
1. Route and x according to the following diagram of steel cable connection.
2. Raise carriages on both sides approximately 800 mm above the ground. Carriages must be on the same height from the
oor.
3. Make sure that the mechanical safety locks in each post are fully engaged before attempting to route cables.
4. After the cable being xed, adjust and make the cable at both sides be with the same tightness which could be judged
by the sound emitted during lifting process. Make judge and adjustment after trial running.
5. Grease after being xed. (It is a must.)
Step6: Connect steel cables.
1. Route and fix according to the following diagram of steel cable connection.
2. Raise carriages on both sides approximately 800mm above the ground. Carriages must be on the same height from the floor.
3. Make sure that the mechanical safety locks in each post are fully engaged before attempting to route cables.
4. After the cable being fixed, adjust and make the cable at both sides be with the same tightness which could be judged by the
sound emitted during lifting process. Make judge and adjustment after trial running.
5. Grease after being fixed. (It is a must.)
Fig� 7