3-11 Installing Server
The UPS service outlets are categorized into two groups: SWITCH OUT and UN-SWITCH OUT.
(They may be called "OUTPUT1" and "OUTPUT2".)
For constant power supply, connect the power cord to a UN-SWITCH OUT outlet. (Connect the
modem that is in service for 24 hours to this outlet.)
When the power cord from the server is connected to a UPS, change the BIOS setup of the server to
link with power supply from the UPS.
Select [AC-LINK] from [System Hardware] on the BIOS setup utility and change parameters. See
the separate volume of Users Guide for details.