EasyManua.ls Logo

NEC SL2100 - 4.2.4 Abbreviated (Speed) Dialing <for Outside>; 4.2.5 One-Touch; DSS Call

NEC SL2100
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SL2100 GETTING STARTED GUIDE
25
Items
List of Contents
Quantity
Note
IP7[ ]-CPU-C1
CPU-C1 Board
1
Lithium Battery (CR2032)
1
EULA sheet
1
IP7WW-082U-B1
082U-B1 Board
1
IP7WW-008U-C1
008U-C1 Board
1
IP7WW-000U-C1
000U-C1 Board
1
IP7WW-3COIDB-C1
3COIDB-C1 Board
1
3 x 8 Screw with Washer and Spring Washer
1
IP7WW-1PRIDB-C1
1PRIDB-C1 Board
1
3 x 8 Screw with Washer and Spring Washer
1
IP7WW-VOIPDB-C1
VoIP Daughter Board
1
3 x 8 Screw with Washer and Spring Washer
4
Unpack other parts as necessary.
Section 2
Installation
2.1 General Precautions
Ensure you take the following precautions when installing the SL2100 system.
To avoid shock or equipment damage, do not plug in or turn the system power on before
completing the installation process.
Avoid working with the equipment during electrical storms.
Use only commercial AC power to prevent shock or fire.
Use the power cord supplied with the chassis.
Install batteries with the correct polarity to prevent damaging equipment.
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically designed for wet
locations.
Never touch uninsulated telephone wires or terminals unless the telephone line is
disconnected at the network interface.
To avoid damage, the chassis should not be placed on unstable surfaces.
To avoid damage the plastic parts, never use an electric screw driver to tighten the screws.
To prevent overheating, do not bundle AC power cords together.
Make sure the chassis has proper earth ground.
If Expansion Chassis are installed, turn the power on/off in the following order:
Expansion 2 Chassis, Expansion 1 Chassis and then Main Chassis
!! Not all boards are hot swappable. Do not remove or install from the chassis when powering
up.
2.2 Preparations
Make sure the necessary tools (screw driver set, pliers set, etc) are available.
Make sure you have a building plan showing common equipment, extensions, the telecom
demarcation, and earth ground location. The installation site must meet the following site /
environmental requirements.
2.3 Site Requirements
The system should be wall-mounted only. Ensure enough space exists to allow the installation
of additional Chassis and/or a battery box.
A dedicated 100V-120V/220V/230V/240VAC circuit located within two meters of the Chassis is
required. A separate dedicated AC outlet is necessary for each Chassis.

Table of Contents

Other manuals for NEC SL2100

Related product manuals