EasyManua.ls Logo

Nedap SmartFlow - Page 39

Nedap SmartFlow
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Nedap SmartFlow / Installation manual
Version 01.001 / 2021 / EN
37
Dairy Farming
Store the new Zero Point test result by selecting the option to overwrite the existing value and
recalibrate (see Calibrate the SmartFlow (page 30)).
b. The SmartFlow is technically not fine: Follow the following procedure:
1. Fix the SmartFlow.
2. Perform a new Zero Point test.
3. Recalibrate (see Calibrate the SmartFlow (page 30)).
4. Click on the Submit button to leave the test page.
5. Go to Reports > Milking > Smartflows to see the Zero Point test report.
a. When the Zero Point test results were saved correctly, the test date is shown in the Last updated
column.
b.
.
The report can be printed by using the print icon.
6. Send the "Zero point test" report to your ICAR Member Organization.

Other manuals for Nedap SmartFlow

Related product manuals