3.2 WIRE CONNECTIONS
Wire connections to the uPASS Reach are user friendly spring cage terminal
connectors.
Connection procedure with spring cage terminal connectors.
1 Strip wire lead for about 9 mm (0.35
inch).
2 Push the screwdriver straight down
to release the spring cage. Use a
slotted, narrow-head screwdriver.
3 Insert the wire lead into the wire
terminal.
4 Remove the screwdriver, this clamps
the wire.
5 Gently pull on the installed wire to
make sure the connection is reliable.
Figure 9: Wiring detail
See appendix A for recommended maximum and minimum conductor cross sections
and for the recommended wire stripping length.
3.3 POWER SUPPLY
The UF reader requires DC power supply in the range from 12 24V. Maximum
current consumption is 1A @ 12VDC, 0.5A @ 24VDC.
Connections:
DC-
Power supply 0V.
DC+
Power supply 12 - 24VDC.
.
Power supply
Figure 10: Power supply wiring
Note
Each connector terminal
can accommodate only 1
solid or stranded wire.
Wiring is normally done
without ferrules. However,
it is possible to use ferrules,
provided that they are
properly crimped.
Note
The power supply
connection has an auto
resetting fuse protection