Start-up and inspection
START GUIDE
NOTE
There must be water in the climate system before
S735 is started.
1. Start S735 by pressing the on/off button (SF1).
2. Follow the instructions in the display’s start guide. If the
start guide does not start when you start the S735, you
can start it manually in menu 7.7.
TIP
See the section "Control – Introduction" for a more
detailed introduction to the installation's control
system (operation, menus, etc.).
If the building is cooled when S735 starts, the compressor
may not be able to meet the entire demand without having
to use additional heating.
Commissioning
The first time the installation is started a start guide is star-
ted. The start guide instructions state what needs to carried
out at the first start together with a run through of the in-
stallation’s basic settings.
The start guide ensures that the start-up is carried out cor-
rectly and, for this reason, cannot be skipped.
Caution
The fan is in operation when the start guide is run.
Operation in the start guide
A. Page
B. Menu number
C. Option / setting
Slovenšcina
Suomi
Svenska
Türkçe
1/29
4.9
Arrow
Language
Russiky
A. Page
Here you can see how far you have come in the start guide.
Drag to the right or left with your finger to browse between
the pages.
You can also press the arrows in the top corners to browse.
B. Menu number
Here, you can see which menu in the control system this
page of the start guide is based on.
If you want to read more about the affected menu, either
consult its help menu or read the Installer Manual.
C. Option / setting
Make settings for the system here.
NIBE S735Chapter 6 | Commissioning and adjusting30