EasyManua.ls Logo

Nibe SCU 10 - Docking; For the Installer; General Information for the Installer; Inspection of the Installation

Nibe SCU 10
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
General information for the installer
SCU 10 used when docking solar heating to your heating
system. For control to start working, it must be activated in
the operating menu.
Docking
The safety equipment must be installed in accordance with
current regulations for all docking options.
See www.nibe.se/docking for more docking options.
Inspection of the installation
Current regulations require the heating installation to be in-
spected before it is commissioned. The inspection must be
carried out by a suitably qualified person and should be
documented. The above applies to installations with a closed
expansion vessel. If the electric boiler or the expansion vessel
is replaced, the installation must be inspected again.
LEK
NOTE
Work behind panels secured by screws may only be
carried out by a qualified installation engineer.
NOTE
Electrical installation and service must be carried out
under the supervision of a qualified electrician.
Electrical installation and wiring must be carried out
in accordance with the stipulations in force.
NOTE
To prevent interference, sensor cables and communic-
ation cables must be separated (min 20 cm) from high
voltage cable when cable routing.
SCU 1010
For the Installer
General information for the installer

Related product manuals