15
1
3
5
11
1
6
2
Q
K
U
7
3
68
9
10
M
L
T
611
V
OPEN gate and reattach operator with clevis pin. Check to
ensure the operator is level.
Secure post pivot bracket to post bracket with the hardware
provided (Q,K,U) when you have achieved the 1” clearance
shown in Step 5 in both open and closed positions.
Mark middle of post bracket slots on fence post. Mark middle
of gate bracket slots on gate cross support.
Remove clamps, post bracket, gate bracket, and operator. Then
use a hammer and center punch to mark
hole positions.
Drill holes completely through gate post and gate cross support.
Attach post bracket assembly to gate post. NOTE: Must be
through bolted.
Gate Operator Installation