EasyManua.ls Logo

NPK DG16 - User Manual

Default Icon
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
DEMOLITION GRAB
INSTRUCTION MANUAL
MODELS:
DG16
DG20
DG30
DG40
“Use Genuine NPK Parts”
7550 Independence Drive
Walton Hills, OH 44146-5541
Phone (440) 232-7900
Toll-free (800) 225-4379
Fax (440) 232-6294
© Copyright 2018 NPK Construction Equipment, Inc. www.npkce.com DG000-9600A
DG16,DG20,DG30,DG40 Demolition Grab Instruction Manual 6-18

Table of Contents

Questions and Answers

  • J
    jackcruzJul 31, 2025
    What to do if NPK Industrial Equipment experiences loss of power?
    • A
      Aaron BrennanJul 31, 2025
      If your NPK Industrial Equipment is experiencing a loss of power, there are several potential causes. First, verify the correct relief valve settings of the carrier and the Demo Grab if the carrier or Demo Grab relief valve setting is low. If the operating pressure is less than 3,625 psi (250 bar), adjust or replace the excavator circuit relief valve. For attachment relief valves, replacement is necessary. Also, ensure the relief valve cartridge is tightened and properly adjusted. If the issue persists, consider replacing the o-rings and backup rings of the relief valve cartridge, or the seals in the swivel manifold assembly. Finally, repair the land areas or replace the spindle in the swivel manifold assembly if those are the cause.

Summary

SAFETY

Operation Safety Precautions

Essential safety rules for operating the demolition grab.

INTRODUCTION

SPECIFICATIONS

DG16 Specifications

Technical data including weight, force, capacity, and rotation.

DG20 Specifications

Technical data including weight, force, capacity, and rotation.

DG30 Specifications

Technical data including weight, force, capacity, and rotation.

DG40 Specifications

Technical data including weight, force, capacity, and rotation.

HYDRAULIC INSTALLATION

DEMOLITION GRAB HYDRAULIC CIRCUITS

MOUNTING INSTALLATION

Mounting to the Excavator

Step-by-step guide for attaching the grab to the excavator.

OPERATING INSTRUCTIONS

General Operation Guidelines

Key instructions and warnings for operating the grab.

Operating Techniques and Precautions

Best practices and warnings for operating the grab's jaws and movement.

GENERAL MAINTENANCE

Daily Inspection and Maintenance

Daily checks and maintenance tasks for the grab.

Lubrication Points

Identification and description of all lubrication points on the grab.

SLEWING RING INSPECTION AND MAINTENANCE

ROTARY JOINT MAINTENANCE

TROUBLESHOOTING

Identifying Performance Problems

Classifying and diagnosing issues like loss of power or cycle speed.

Relief Valve Checking and Setting Procedure

Detailed procedure for checking and setting relief valves.

Troubleshooting Chart for Low Power

Table listing problems, causes, checks, and remedies for low power.

Troubleshooting Slow Cylinder Speed

Diagnosing and resolving slow cylinder speed issues.

Troubleshooting Slow Rotation Speed

Diagnosing and resolving slow rotation speed problems.

Troubleshooting Chart for Rotation

Table for diagnosing and fixing rotation issues.

FASTENER TORQUE CHART

CYLINDER TORQUE SPECIFICATIONS

NPK DG16 Specifications

General IconGeneral
BrandNPK
ModelDG16
CategoryIndustrial Equipment
LanguageEnglish