pg. 17
WK-1x User Guide
WK-1-C installation with optional pre-construction bracket
The pre-construction bracket is sold separately.
1. Place the pre-construction bracket against the bottom of the ceiling studs at the desired mounting
location.
2. Mark locations for mounting screws. Drill 1/16” pilot holes at marked locations. Secure pre-construction
bracket to ceiling studs using the provided hardware.
3. Install the sheet rock over the pre-construction bracket. Make note of where the cutout on the pre-
construction bracket is when installing the drywall.
4. Cut opening in sheet rock using the cutout on the pre-construction bracket as a guide.
Note: Pakedge logo should be facing outwards.