EasyManuals Logo

Pall Allegro 50 L User Manual

Pall Allegro 50 L
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
9
5.3 Preparing the Weigh Platform Trolley for Use
Weigh platform quick start guide:
This information is intended to allow the user to quickly start using the weigh platform to
measure the weight of the bag contents. For more advanced operation please refer to the
full instruction manual included with the mixer.
IMPORTANT. The weigh platform is shipped with the weight of the tote lifted off the load cells
by means of 4 half nuts that are rotated upwards on transit bolts. This protects the load cells
from shock and vibration during transit:
The 4 nuts must be wound down the transit bolts to allow the tote to sit freely on the load cells
before any measurements are attempted. The transit bolts must not be removed, full perform-
ance is obtained by rotating the nuts downwards only:
Nuts in the raised position
for transportation
Winding down the top nuts
to engage the load cells

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pall Allegro 50 L and is the answer not in the manual?

Pall Allegro 50 L Specifications

General IconGeneral
BrandPall
ModelAllegro 50 L
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals