Note: For the disassembling procedure, see Section 11.
12 Service Position
12.1. Checking the Main P.C.B., Power P.C.B., Transformer P.C.B. and
Voltage Selector P.C.B.
1. Disassembly of Top Cabinet and Rear Panel.
2. Disassembly of CD Lid.
3. Disassembly of CD Mechanism Unit.
4. Connect FFC board (CN309 & CN310) from CD Mechanism Unit.
35
SA-VK31GC / SA-VK31GS