| User’s Manual
10
4.1 Safety
The Sentinel is tted with uorocarbon seals. All process uid
must be compatible with uorocarbon. Contact Parker with uid
compatibility questions.
4.2 Preparing for Use
Check that the oil in the vacuum pump is at the proper level before
operating.
1. Place the Sentinel on a at surface
2. Lock the brake on the two front wheels
3. Connect the hoses:
a. Hydraulic Outlet
b. Hydraulic Inlet
c. Water Drain
4. Plug in the power cord
Ensure proper ventilation when operating.
See the technical specication for proper power requirements.
4 Operation
This chapter describes the operation of the Sentinel.
2
2
3a
3b
3c
4