EasyManuals Logo

Parker Sentinel User Manual

Parker Sentinel
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
11
| User’s Manual
Sentinel
4.3 Starting
4.3.1 Initial Start-Up
1. Sentinel is shipped with the breakers in the off position and
must be turned on to operate.
2. NEMA L16-30P anged inlet is standard on all units. Cord set
(PN 943238) is available to order through Parker.
3. Power the system on.
4. If the “Phase Fail Alarm” is shown on the display, change the
phase switch position. Press OK, F2.
5. To set the language and to set the date & time, press the menu
button, located in the lower right hand corner of the IQAN.
Languages can be selected through the main set-up screen.
To choose language from the main screen choose preferences,
then F3 for languages.
6. English or Metric units can be selected see 4.6 Adjust Groups.
4.3.2 Starting
1. Power the system on.
2. If the “Phase Fail Alarm” is shown on the display, change the
phase switch position. Press OK, F2.
If oil remains in the system a message will be displayed reminding
the user to drain the oil before operating.
3
4
4
5
1
2
2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Parker Sentinel and is the answer not in the manual?

Parker Sentinel Specifications

General IconGeneral
Filtration TechnologyReverse Osmosis
Storage Tank Capacity3.2 gallons
Operating Temperature40-100°F
Daily Production50 gallons
Warranty1 year limited

Related product manuals