EasyManua.ls Logo

PDC KST80-712 - Steam Venting Package; Adjusting the Vent Valves

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 19 of 24
TAMPER EVIDENT NECK BANDING AND SHRINKSLEEVE LABELING MACHINERY
8 Sheehan Avenue, South Norwalk, CT 06854 USA 203-853-1516 F 203-854-0834 www.pdc-corp.com
6. STEAM VENTING PACKAGE
6.1 Adjusting the Vent Valves
Refer to the setup form and adjust each vent according to the amount of shut/open
needed. For each valve handle, 12 o’clock (upward) position is full open, and
9 o’clock (pointed left) position is full shut, and dial indicates increments of shut
between these two points. (For example, “3/4” indicates 3/4 shut).
Loosen wingnut to adjust valve. Retighten wingnut after adjustment.
FULL SHUT
FULL OPEN
WINGNUT