TAMPER EVIDENT NECK BANDING AND SHRINKSLEEVE LABELING MACHINERY
8 Sheehan Avenue, South Norwalk, CT 06854 USA 203-853-1516 F 203-854-0834 www.pdc-corp.com
7. SHUTDOWN
To shut down the steam system, close the steam supply valve to the regulator. The
condensate trap will discharge any water that is still in the trap.
After all pressure gauges read zero, then turn off the power to the temperature
controller (and vent blower, from the blower VFD ) and shut off the air supply to
the transducer filter/regulator. Turn off the boiler generator, if one is present.
Turn the main power fused disconnect switch to the “off” position.
Follow lockout/tagout procedures.
8. GENERAL TROUBLESHOOTING
Danger: Before opening the filter or condensate trap for any reason, be
sure to first relieve all pressure and to wear appropriate protective clothing!
Some components are under pressure and can cause serious bodily injury or
death!
Warning: Do not touch tunnel components (other than the console) until
unit is off and has had time to cool down. Unit is hot and can burn, causing
serious bodily injury.
Caution: Before any work is to be done on the machine, or before reaching
into the machine for any reason, if possible turn all switches to the off position
including the main power fused disconnect switch and then follow proper
lockout/tagout procedures!
Caution: Ensure that all gauges read zero prior to doing any work on the
tunnel system.
(For more details on installation, operation, and maintenance of the individual