TAMPER EVIDENT NECK BANDING AND SHRINKSLEEVE LABELING MACHINERY
8 Sheehan Avenue, South Norwalk, CT 06854 USA 203-853-1516 F 203-854-0834 www.pdc-corp.com
9. BOILER
The boiler feeds the water into the tunnel and it is important that the boiler is set up
appropriately for the tunnel to perform suitably.
It is recommended that the boiler be within 90 ft of the tunnel.
Boiler size is for installation near tunnel. If remote, a larger
unit will be required.
Boiler should be fed by a nearby hot water heater at least 20
gallons in size.
Boiler to be installed and commissioned by customers’ local
plumbing contractor .
Prior to entering boiler, water may require treatment or
softening for maximum boiler and tunnel life and that if the
water entering these units is not suitable it can potentially lead
to clogging of the valves and nozzles of the tunnel. Contact
local water treatment company for installation and service.