Page 9 of 24
TAMPER EVIDENT NECK BANDING AND SHRINKSLEEVE LABELING MACHINERY
8 Sheehan Avenue, South Norwalk, CT 06854 USA 203-853-1516 F 203-854-0834 www.pdc-corp.com
3.1 Regulator Setup
Slowly open the ball valve at the steam inlet to allow steam to flow into the steam
tunnel manifold. Turn the knob on the Armstrong pressure reducing valve to adjust
until of reading of 75 PSI is achieved on the filter inlet gauge.
Maintenance notes:
When the pressure differential between the filter inlet gauge an
the filter outlet gauge is greater than 5 PSI, the filter needs to be
replaced.
Replacing the filter approximately every 3 months will
minimize other issues such as those that could occur that might
not be as noticeable as a pressure change in the line.
Old filters can be cleaned and reused.
For assistance with this, please contact Anthony Caccamo or
Todd Smith at PDC at (203) 853-1516.
BALL
VALVE
(STEAM
SUPPLY
INLET)
ARMSTRONG
PRESSURE
REDUCING
VALVE