Page 20 of 24
TAMPER EVIDENT NECK BANDING AND SHRINKSLEEVE LABELING MACHINERY
8 Sheehan Avenue, South Norwalk, CT 06854 USA 203-853-1516 F 203-854-0834 www.pdc-corp.com
6.2 Adjusting the Tunnel Stand
Loosen the clamp that connects the tunnel tubing to the vent blower (see below).
Adjust the tunnel to the desired height with the ratchet handle, located centrally at
the back of the tunnel. Once at the desired height, remove fallen containers and/or
perform maintenance. Once completed, make sure that the O-ring is in place in the
clamp joint before retightening the tubing clamp.