PAL-AT Installation Manual
35
5.6 Air Testing
1. Air testing of the secondary containment must be performed before backfilling.
2. All sensor cable termination chambers (see figures 5-3 and 5-4) must be completely installed before
applying the air test. Also, cap any open vents or drains. Be careful to prevent the pull rope or sensor
cable from being blown back into the secondary containment.
3. Assemble required piping for air test and follow test procedure provided by the secondary containment
piping manufacturer's installation guide.
CAUTION: THE COMPRESSED AIR SUPPLY MUST BE FREE OF WATER AND OIL.
4. After the air test has been completed, remove test piping and cap test ports on the secondary
containment.

Table of Contents

Other manuals for Permalert PAL-AT AT30K

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Permalert PAL-AT AT30K and is the answer not in the manual?

Permalert PAL-AT AT30K Specifications

General IconGeneral
BrandPermalert
ModelPAL-AT AT30K
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals