10.9 End of Run Termination
Install a NEMA 4X [IP66] junction box near the end of the pipe. Electrical conduit should be used to protect
the wire if the box is more than a few inches from the pipe end seal. The ATP cable from the pipe should
be spliced to 50 ft [15 m] of ATP cable that is coiled in the junction box (100 ft [30 m] is required if the cable
length is greater than 3300 ft [1000 m]). Make sure the ATP cable remains twisted. The splices to the red
and white wires should be staggered and encapsulated with shrink tubing as described previously.
Figure 10-4
ATP Cable End of Run Detail

Table of Contents

Other manuals for Permalert PAL-AT AT30K

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Permalert PAL-AT AT30K and is the answer not in the manual?

Permalert PAL-AT AT30K Specifications

General IconGeneral
BrandPermalert
ModelPAL-AT AT30K
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals