PFT G 5 SUPER Operating Manual Issued 11.2008
Knauf PFT GmbH & Co.KG
3
Dear PFT customer
Congratulations on your purchase. You have made a wise choice as you clearly value the quality
that comes with a brand name product from a reputable company.
The PFT G 5 SUPER mixer pump uses state-of-the-art technology. It was functionally designed to
be a reliable aid under rough construction site conditions.
This operating manual should always be stored and kept at hand at the site where the machine is
used. It contains information on the various functions of the machine. Study the operating manual
thoroughly before starting the machine, as we accept no liability for accidents or damage to the
machine caused by incorrect operation.
The PFT G 5 SUPER mixer pump will prove to be a trustworthy aid providing it is operated
correctly and handled with care.
It is prohibited to forward this document, even excerpts, without our written authorisation. All
technical specifications, diagrams etc. are subject to copyright law. All rights, errors and
modifications are reserved.
Initial inspection after delivery:
An important task of all technicians delivering the PFT G 5 SUPER is the inspection of the machine
settings at the end of the first work phase. The factory settings may change during the initial cycle.
If these changes are not corrected in time, immediately after run-in, problems may arise during
operation.
Following receipt of the PFT G 5 SUPER mixer pump and training in regard to it, i.e. after about
two hours of operation, the technician must always carry out the following checks / make the
following settings:
¾ Water safety switch
¾ Pump pressure, back pressure
¾ Pressure relief valve on compressor
¾ Air nozzle tube (Spraying pattern)
¾ Air safety switch
¾ Compressor pressure switch
¾ Remote control switch
¾ Pressure reducing valve
¾ Motor safety switch