Mixing pump RITMO L / RITMO M Overview - Operation
Maintenance work
2016-02-17
65
49.3 Environmental protection
Observe the following notes on environmental protection when
carrying out maintenance works:
Remove the discharged, exhausted or surplus grease at all
greasing points that are lubricated manually and dispose of in
accordance with the local applicable regulations.
Collect replaced oil in suitable containers and dispose of in
accordance with the local applicable regulations.
49.4 Maintenance plan
The following paragraphs describe the maintenance works that are
require for an ideal and trouble-free operation.
In the event that increased wear is detected during regular checks,
the required maintenance intervals have to be shortened according
to the actual signs of wear.
Should you have any queries regarding maintenance works and
intervals contact the manufacturer, see page 2 for service
addresses.
NOTE!
Maintenance is limited to a few checks. Thorough
cleaning after use is the most important
maintenance.
Interval Maintenance work To be carried out by
daily Clean/replace strainer screen in water inlet. Operator
weekly Clean/replace suction filter of compressor. Service engineer
2 weeks Clean/replace strainer screen in pressure reducer. Service engineer
50 Maintenance work
50.1 Strainer screen
Fig. 112: Strainer screen in water inlet.
Check strainer screen in water inlet daily:
1. Remove the strainer screen from Geka-coupling.
2. Cleaning strainer screen.
3. Replace the sieve in case of heavy contamination.
4. Reinsert strainer screen
.
Strainer screen Geka-coupling: Article number 20152000
Implementation by operator.