EasyManua.ls Logo

PGO BR-500 - Page 24

PGO BR-500
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- Using a 27-mm wrench, turn
the central pulley nut to
horizontally align the central
inside holes and install the
specific tool.
Specific equipment and
tools:
Driving pulley stop
wrench 020474Y009
- Insert the retain band of the
specific tool into the pulley
first, so that the groove is fully
abutted.
- Then, insert the tool so as to
insert the stud bolts on the
band into the holes obtained
onto the tool itself.
- Tighten the two tool fastening
nuts by hand.
- Loosen the central nut.
- Remove the spring washer
and the flat washer.
- Remove the fixed driving
half-pulley.
- Remove the bushing
connection washer.
- Move the belt downwards.
- Suitable support the roller
contrast and extract the mobile
driving half-pulley with the
relevant bushing and the rear
washer, being careful not to
make the rollers come out.
PGO BR-500 ENGINE
P.10-5
Automatic Transmission