EasyManua.ls Logo

PGO BR-500 - Page 23

PGO BR-500
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-
Remove the Transmission
cover
- Unscrew the two screws shown in the figure
to remove the air conveyor.
Tightening torque:
Air conveyor screws: 11 ~12 Nm
PGO BR-500 ENGINE
- Check that the roller is free from wear and
that it rotates freely.
- Remove the fastening screw by a 13-mm
wrench.
- Remove the roller and the bearing.
N.B.: If the roller does not rotate
freely, it requires replacement.
P.10-4
Automatic Transmission