EasyManua.ls Logo

PICO pH - Mounting Bracket Assembly; Prepare the Probe for Start-Up

PICO pH
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instruction and Operator's Manual PICO pH
6
2.3.3 Mounting bracket assembly
Fig. 4
2.3.4 Prepare the probe for start-up
1) Remove the
protective cap from
the probe and keep it
for winter storage.
2) Bathe the probe in
tap water for at least
20 minutes, which is
why we recommend
you start your
installation with this.

Table of Contents