Commissioning
Operating Manual PSENvip RL D P Set
1001641-EN-09
| 63
7 Commissioning
7.1 Commissioning guidelines
When commissioning for the first time, please note the following:
CAUTION!
Have the protective equipment tested and approved before commis-
sioning for the first time!
Any machine safeguarded by the PSENvip must be tested and approved by
qualified personnel before it is placed on the market. A test report must be
generated and archived during initial commissioning.
Please refer to the guidelines given in the chapter entitled "Safety", under
"Qualified Personnel".
Initial commissioning involves
} Aligning the transmitter and receiver
} Tracking the adjustment line to the tip of the upper tool
} Entering the overrun
} Performing the function test using the test piece
The tool change adjustment involves
} Tracking the adjustment line to the tip of the upper tool
} Performing the function test using the test piece
NOTICE
The tool change adjustment must also be made during initial commission-
ing.
7.2 Initial commissioning
7.2.1 Align transmitter and receiver
Please note the following when aligning the transmitter and receiver:
} Once installed, the transmitter and receiver must be exactly aligned to each other and to
the tip of the upper tool. The vertical and horizontal alignment is performed using adjust-
ment templates and is displayed on the receiver.
} The transmitter and receiver must also be aligned after changing either the PSENvip
transmitter or receiver.