PH-20/PHX-20 Manual
21
10. Set Pump Switch [Y, page 12] to NORMAL. Turn Hydraulic Pressure Control
CLOCKWISE increasing material pressure to 400 psi. Both Material Pressure Gauges
[H, K, page 9] should read the same. Check all Heated Hose Coupling connections for
leakage.
11. Check all TSU and “Fast-Lock” connections for leaks.
12. Bundle all Heated Hose Connections ensuring that there are NO kinks in the TSU
Cable or Air Hose. Wrap with Electrical Tape to securely hold all components in place
and minimize places for bundle to snag onto job site protrusions.