QUICK START - SET UP GUIDE
The flow chart below shows the steps required to install and start using your Pool Lab ASP
for the first time.
21
FIT ALL THREE REAGENT BAGS
SEE “CONSUMABLES”
CONNECT ACID RESERVOIR TO
DELIVERY SYSTEM
SEE “CONSUMABLES”
CONNECT POWER/DATA CABLE FROM ASP
TO “ASP” PORT AT BOTTOM OF CHLORINATOR
CONTROL BOX
TURN POWER ON TO SYSTEM
LEAVE IN “OFF” MODE
UNTIL CONFIGURATION IS COMPLETE
SET POOL AND SPA VOLUMES
NOTE: INSTALLER LEVEL ACCESS REQUIRED
SEE “SYSTEM CONFIGURATION”
SET USER PREFERENCES
SEE “SETTINGS”
SET FILTRATION TIMERS
AS PER CHLORINATOR MANUAL
BEFORE STARTING SYSTEM, PLEASE ENSURE:
1. FILTRATION PUMP IS CONNECTED TO POWER SOCKET
AT BOTTOM OF CHLORINATOR CONTROL BOX
2. ENSURE ALL FLOW VALVE ARE SET CORRECTLY
INSTALL THE POOL LAB CHLORINATOR AND ASP
SEE “INSTALLATION GUIDE”
SET MODE TO “ON” OR “AUTO” TO START SYSTEM
“ON” WILL RUN THE SYSTEM CONTINUOUSLY
“AUTO” WILL RUN THE SYSTEM DURING THE SET TIMES