5. Select the required menu point with the control knob.
Menu point Menu point
- Time and date - Primary contr/system pump
- Operator section - Boiler
- Wireless
- Time prog heating circuit 1 - Cascade
- Time prog heating circuit 2 - Solar
- Time program 3/HC3 - Solid fuel boiler
- Time program 4 / DHW - Buffer
- Time program 5 - DHW storage tank
- Holidays heating circuit 1
- Holidays heating circuit 2 - Configuration
- Holidays heating circuit 3 - LPB-system
- Heating circuit 1 - Fault
- Heating circuit 2 - Service/special operation
- Heating circuit 3 - Input/output test
- DHW - State
- Consumer circuit 1 - Diagnostics cascade
- Consumer circuit 2 - Diagnostics heat generation
- Swimming pool circuit - Diagnostics consumers
- Swimming pool - Burner control
Note: Not all menu points are visible, depending on the selection of setting level
and programming!
8.2 Modification of parameters
Settings, which are not directly modified via the front panel, have to be carried out
in the setting level.
The
basic programming processs is depicted in the following by the setting of time
and date.
1.
Press OK button
Note
: If parametres which are not mentioned in the level below are subject to
change consider section Programming procedure!
Programming
7308272-03 03.14 Paramount three 30-115 kW 49