tAsk 2: Mounting Vess A6120
in A RAck
The instructions here apply to the all Vess A6120 Series 1U form factor
models.
The Vess A6120 installs in a 19” equipment rack. Please examine the
illustrations in this section to make sure you are using the correct type of rack.
In order to place the system in the rack, rst attach the ear brackets to the
front of the device. Then install the sliding rail system in the rack. Finally place
the device on the sliding rails and secure it to the rack. Use only the screws
and fasteners included with the shipment of the sliding rail system, or with the
Vess A6120. This procedure is described and illustrated in the sections that
follow below.
Warnings
Elevated Operating Ambient - If installed in a closed
or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater
than room ambient. Therefore, consideration
should be given to installing the equipment in an
environment compatible with the maximum ambient
temperature (Tma) specied by the manufacturer.
Reduced Air Flow - Installation of the equipment in
a rack should be such that the amount of air ow
required for safe operation of the equipment is not
compromised.
Mechanical Loading - Mounting of the equipment in
the rack should be such that a hazardous condition
is not achieved due to uneven mechanical loading.
Circuit Overloading - Consideration should be given
to the connection of the equipment to the supply
circuit and the effect that overloading of the circuits
might have on over current protection and supply
wiring. Appropriate consideration of equipment
nameplate ratings should be used when addressing
this concern.
Reliable Earthing - Reliable earthing of rack-
mounted equipment should be maintained.
Particular attention should be given to supply
connections other than direct connections to the
branch circuit (e.g. use of power strips).
5
Vess A6120 Storage Server Appliance

Other manuals for Promise Technology Vess A Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Promise Technology Vess A Series and is the answer not in the manual?

Promise Technology Vess A Series Specifications

General IconGeneral
BrandPromise Technology
ModelVess A Series
CategoryNetwork Hardware
LanguageEnglish

Related product manuals