4 | Transport
80.06.562_IM_2-XS_ 2-S_en-INT 21 / 56
2. Slowly transport the unit to the site with the pallet truck. Hold on to the unit
during transport.
3. Lift the unit at the lifting points and place it on its intended installation sur-
face.
4. Remove the straps.
>> The unit is standing on its intended installation surface and is ready for as-
sembly and installation.