APPENDIX 8
TANK INJECTION MODULE INSTALLATION
1. PLUMBING THE INJECTION MODULE
1) Plumb Pressure Relief Valve (PRV), Flow Meter, Control Valve, Carrier Check Valve, Product Check
Valves, and In-line Mixer just ahead of the Boom On/Off Valves as shown in Figure 4.
2) Mount Injection Modules close to the Boom On/Off Valves to minimize amount of product in tubing.
3) Plumb output lines of Injection Modules to Product Check Valves (See Figure 23). Use 3/8 inch [10
mm] tubing on low volume modules and 1/2 inch [13 mm] tubing on high volume modules. Product
Check Valves and tubing not furnished.
FIGURE 23

Table of Contents

Other manuals for Raven SCS 700 PGM Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Raven SCS 700 PGM Series and is the answer not in the manual?

Raven SCS 700 PGM Series Specifications

General IconGeneral
BrandRaven
ModelSCS 700 PGM Series
CategoryMusic Mixer
LanguageEnglish

Related product manuals