EasyManua.ls Logo

Realistic PRO-2004 - Alignment Preparation

Realistic PRO-2004
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ALIGNMENT
PREPARATION
Test equip"ment required
t. Oscilloscope
2
ACSSVM
3.
DC
SSVM
4.
B-ohm
dummy
load
5.
AM.
FM.
Signal Generator (25 to 1300
MHz)
6. Distortion Meter
NOTE
1:
Use
non·metallic runing tools.
The
test equipment and Receiver should
be
warmed
up
at
least
30
minutes before proceeding
with
alignment.
Input
signal from the Generator should be kept
as
low
as
possible and
still
obtain usable output.
-
if)
-

Other manuals for Realistic PRO-2004

Related product manuals