EasyManua.ls Logo

Realtech REAL CLEAN SYSTEM I - Maintenance; 10 Parts and Accessories; Table 6: Maintenance Tasks and Frequency for Real Clean System; Table 7: Spare Parts for Real Clean System

Default Icon
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Real Clean System I v 2.1
Real Tech Inc. 16
9 Maintenance
Following the manufacturer’s recommended maintenance schedule will ensure optimal performance of the
product. Parts and accessories are outlined in Section 10.
A standard recommended maintenance schedule for the Real Clean system is as follows:
Table 6: Maintenance tasks and frequency for Real Clean system
FREQUENCY
TASK
Site Specific
Automatic cleaning cycle configuration to ensure proper sensor cleaning
Weekly
Visual inspection for leaks, corrosion or other issues.
Inspect cleaning fluid levels. Replenish if necessary.
View connected analyzer or controller display for configured cleaning alarms.
10 Parts and Accessories
Table 7: Spare parts for Real Clean system
PRODUCT NAME
DESCRIPTION
PART NUMBER
Cleaning Fluid Bottle
1 Litre wash bottle for chemical fluid storage
S-166011
Chemical Pump Tubing
Replacement internal pump tubing for chemical pump
UVT-139013