EasyManua.ls Logo

Realtech REAL CLEAN SYSTEM I - Plumbing; Figure 5.4: Real Clean System Ports; Figure 5.5: Real Clean Plumbing with Dual Feed

Default Icon
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Real Clean System I v 2.1
Real Tech Inc. 8
5.4 Plumbing
Process water from a pressurized source flows through the Real Clean system and into the connected
instrument for measurement.
Piping is required to be ¼” OD flex tubing of whatever pressure rating is needed for the particular site. Figure
5.4 displays the two push-to-connect inlet and outlet ports on the side of the Real Clean system.
The Real Clean system is connected in series with the instrument to be cleaned. It is preferred to keep the
tubing between the Real Clean and instrument less than 2 feet. Configurations for the M series instruments are
outlined in Figure 5.6.
Note: If installing with a Dual Feed system, the Real Clean will be installed prior to the Dual feed on the Stream
1 port (See Figure 5.5). Refer also to the Dual Feed manual for further instructions.
Figure 5.4: Real Clean system ports
From Process
To Analyzer
To Stream 1
From Process
To Analyzer
Figure 5.5: Real Clean plumbing with Dual Feed