11
4.9 Installing the Single Stage LPG Solenoid Valve 23
4.10 Wiring the Single Stage LPG Solenoid Valve 23
4.12 Wiring the Dual Stage LPG Valve 24
4.11 Installing the Dual-Stage LPG Valve 24
4.13 Installing the Junction Box and Printer 26
4.14 Wiring the E4000 Register Head 26
4.15 Wiring the Junction Box 28
4.15 Wiring the RML2000 Meter to the E4000 Register 30
4.16 Installing the Printer 31
4.17 Connecting Power to the Junction Box 31
4.15 Connecting a Mobile Computer 33
5. START UP AND CALIBRATION 34
5.1 Route Mode 34
5.2 Conguring the E4000 36
5.3 Conguring and Zeroing the RML2000 38
5.4 Calibrating the E4000 volumetric K-Factor 44
6. INSTALLATION CHECKLISTS 51
7. E4000 INITIALIZATION PROCEDURE 53
8. INTRODUCTION TO RESPONSIBLE RECYCLING (R2) 55
9. POWER/DATA CABLE WIRE COLOR CONVERSION CHART 57