Filler Panel
A
B
Attach ller panels on both sides of the pit (A) with magnet
connection. Depending on the pit it may be necessary to:
• Trim ller panel sides/edges to t between pit wall and
leveler under-structure.
• Trim or drill ller panel to t around obstructions
(e.g. wires, pipe or conduit).
• Remove the magnets and anchor the ller panels.
NOTE:
• DO NOT use a ller panel, if leveler under-structure
extends to the edges of the pit or across the entire
structure of the pit.
• Filler panel can overlap leveler under-structure (B) by up
to 2 in (51 mm). Magnets must remain ush with pit oor.
High Negative Pressure Applications
D
E
C
Side View
For high negative pressure buildings, the bottom ap of
main curtain (C) can be attached to ller panel magnet
brackets (D). Remove washer (E) and re-attach with
bottom ap of main curtain between washer and magnet
bracket.