10.
DISASSEMBLY
and
REASSEMBLY
10-1
PREPARATIONS and SUGGESTIONS
1)
When disassembling the engine, carefully remember the locations of individual parts
so
that they can be reassembled cor-
rectly. If you are uncertain
of
identifying some parts, it is suggested that tags be attached to them.
2)
Have boxes ready
to
keep the disassembled parts separated by group.
3)
To
prevent loss or misplacement, temporarily assemble each group of disassembled parts.
4)
Use the correct tools in the correct way.
10-2
HOW
TO
DISASSEMBLE
Order
Remarks
I
Tool
Procedures Item
1
Remove cord bushing
by
j
(3)
Disengage lead connector which con-
i
ently for correct reassem-
I
connector which connects generator to
i
(2)
Move control box, and disengage lead
1
Leads are colored differ-
or
(+)
screwdriver
:
generator. (See Fig.
10-
1.)
8
mm box wrench
Control box
,
(1) Remove bolts fastening control box to
:
i
So
bolt.
.
.4
pcs
,
control box.
bly.
nects AVR in control box
to
engine,
remove cord bushing from control box,
pulling
it
hard.
and
pull
out leads. (See Fig.
10-2.)
Note: The disassembly and reassembly of the internal parts
of
the control
box
are mentioned in
10-4.
Fig.
10-
1
Fig.
10-2
-39-