Quick Start Guide
00825-0100-4686, Rev EA
June 2016
Rosemount
1195 Integral Orifice
Assembly
00825-0100-4686 EA.fm Page 1 Friday, June 17, 2016 4:39 PM
Question and Answer IconNeed help?

Do you have a question about the Rosemount 1195 and is the answer not in the manual?

Rosemount 1195 Specifications

General IconGeneral
BrandRosemount
Model1195
CategoryMeasuring Instruments
LanguageEnglish

Summary

Integral Orifice Assembly View

Location and Orientation

Straight Pipe Length

Determines required upstream and downstream pipe lengths for accurate flow measurement.

Primary Element Orientation

Primary Element Installation

Preparing for Operation

Direct Mount Preparation

Procedures for preparing direct mount units for liquid, gas, and steam.

Remote Mount Preparation

Procedures for preparing remote mount units for gas, liquid, and steam.

Product Certifications

Approved Manufacturing Locations

Lists the authorized manufacturing facilities for the product.

European Directive Information

Provides details on EC declaration of conformity for European directives.

Hazardous Locations Certifications

References certifications for hazardous location installations.

Related product manuals