Rosemount 8732 Series User Manual

Rosemount 8732 Series
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
www.rosemount.com
¢00825-0100-4725.¤
Quick Installation Guide
00825-0100-4725, Rev BA
July 2003
Rosemount 8732/8700 Series
Rosemount Magnetic Flowmeter
System (Transmitter and Flowtube)
Step 1: Pre-Installation
Step 2: Handling
Step 3: Mounting
Step 4: Installation (Flanged Flowtubes)
Step 4: Installation (Wafer Flowtubes)
Step 4: Installation (Sanitary Flowtubes)
Step 5: Grounding
Step 6: Wiring
Step 7: Basic Configuration
Start
Step 9: Power up the Transmitter
Step 10: Check Process Connections
Step 11: Confirm Configuration
End
Step 8: Process Leak Protection (Optional)
4725_revBA_qig.fm Page 1 Thursday, July 3, 2003 12:47 PM
Question and Answer IconNeed help?

Do you have a question about the Rosemount 8732 Series and is the answer not in the manual?

Rosemount 8732 Series Specifications

General IconGeneral
CategoryMeasuring Instruments
DiagnosticsYes
Measurement TypeVolumetric Flow
Output4-20 mA, HART
Enclosure RatingNEMA 4X, IP66
Communication ProtocolHART, FOUNDATION Fieldbus, Modbus
Product TypeTransmitter
EnclosureStainless Steel
Process ConnectionFlanged
MaterialStainless Steel
CertificationsATEX, IECEx, CSA, FM
Power Supply11 to 42.4 VDC
Flow Range0.04 to 12 m/s (0.13 to 39 ft/s)

Summary

Pre-Installation Steps

Mechanical Installation Considerations

Details requirements for transmitter mounting location, including space and orientation.

Environmental Installation Considerations

Advises on avoiding heat and vibration for optimal transmitter life, citing common issues.

Product Handling Procedures

Flowmeter Mounting Guidelines

Piping Requirements for Mounting

Specifies minimum straight pipe diameters upstream and downstream for accuracy.

Flowtube Mounting Orientation

Details preferred vertical installation and restrictions for horizontal mounting.

Flanged Flowtube Installation

Flanged Flowtube Gaskets and Bolting

Explains gasket requirements and details flange bolt tightening sequence and torque.

Wafer Flowtube Installation

Wafer Flowtube Gaskets

Explains gasket requirements and material compatibility for wafer connections.

Wafer Flowtube Alignment and Bolting

Details centering ring placement, stud insertion, and tightening for wafer flowtubes.

Wafer Flowtube Flange Bolt Tightening

Instructs on tightening flange bolts, checking for leaks, and second torquing.

Sanitary Flowtube Installation

Sanitary Flowtube Gaskets and Alignment

Describes gasket needs and states standard practices for sanitary fitting alignment.

Grounding and Earthing

Grounding Options and Requirements

Covers general grounding, internal connection, and options based on pipe type.

Electrical Wiring and Connections

Conduit Ports and Cable Management

Details conduit requirements, cable routing, selection, and preparation for system wiring.

Transmitter Coil Power Input

Explains wiring for supplying power to flowtube coils through the transmitter.

Power Supply Wire and Disconnect Requirements

Specifies wire needs, temperature ratings, and external disconnects for safe power connection.

Overcurrent Protection and Communication

Details overcurrent protection, fuse ratings, and 4-20 mA loop power connection.

Transmitter to Flowtube Wiring Diagrams

Illustrates wiring for remote and integral mount configurations.

Basic Transmitter Configuration

Basic Configuration Setup Parameters

Covers Tag, Flow Rate Units, URV, LRV, and Line Size for initial transmitter configuration.