Protocol of installation
The lift, designation... ....................................................... (Address)... /
• After successful installation please lled completely this form, tick applicable points and sign the form.
• Copy the original and send them to the manufacturer within a week.
• Leave a copy in the test book.
The vehicle lift,
Type .............................................................
Serial number: .............................................................
was on .............................................................
by the company .............................................................
(Address)
.............................................................
set up, checked for function and safety and put into operation.
The installation was carried out by the operator / Qualied person
the operator conrmed putting up the lift. All details of the operation. All information of the manual
as well as the inspection book have been read and observed. These documents are available to the
instructed operators at all time and are kept in an accessible place.
The expert (qualied person) conrms the correct installation of the lifting platform.
All information on the operating instructions and the inspection book have been read. The documents were
handed over to the operator.
...................... ............................................................ ..............................................
Date Name of operator + company stamp Signature operator
...................... ............................................................ ..............................................
Date Name of qualied person Signature qualied person
.....................................................................................................
Customer service company